제품 설명
| Model NO. | 06C/08A/10A/12A/16A/20A/24A/28A/32A/40A/06B/08B/10B/12B/16B/20B/24B/28B/32B/40B-1/2/3 Heavy duty |
| Chain Model | 롤러 체인 |
| Structure (for Chain) | 롤러 체인 |
| Specification | GB/T, DIN, ANSI, ISO, BS, JIS. |
| Origin | HangZhou, ZheJiang |
| 색상 | 단색 |
| Chain Color | Customized |
Our company
Wolff Chain Co. is 1 of the professional chain manufacturers in China. We focus on reseaching, manufacturing and trading of the chain drive with famous brands — “DOVON” and “DECHO”. We supply OEM services for many famous enterprises such as SUZUKI, XIHU (WEST LAKE) DIS., FAW, AGCO, JUMING as well.
Wolff mainly producing the Transmission chains,Conveyor chains,Dragging Chains,Silent chains,Leaf chains,Roller chains,Special chain and many other series of chain products. Our technicians a have improved the chains quality to the world-level. High quality material selection, powerful and precise heat-treatment technology and excellent assembly methods ensure Wolff chains meet the tough and strict requirements for machines and vehicles.
All of our products completely conform to the international standard such as ISO\DIN\ANSI\BS\JIS, etc. Wolff has been successfully certified by ISO9001 Quality Management System,SGS inspection and BV inspection. Wolff chains can be widely applied to many industries including automobile, motorcycle, forklift, wood processing machine, constructure machine, packing machine, food machine,tobacco machine and agricultural equipments. Wolff chains are popular in America,South America,Europe,Middle East, South East Asia and Africa markets.
Our workshop
Our certification
Welcome to our exhibition
자주 묻는 질문
큐1. What is your terms of packing?
A: Generally, we pack our goods in single color box. If you have special request about packing, pls negotiate with us in advance, we can pack the goods as your request.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We’ll show you the photos of the products and packages
before you pay the balance. Other payments terms, pls negotiate with us in advance, we can discuss.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 25 to 30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.We welcome sample order.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
| 표준 또는 비표준: | 기준 |
|---|---|
| 애플리케이션: | 섬유 기계, 의류 기계, 컨베이어 장비, 포장 기계, 식품 기계, 해양, 광산 장비 |
| 표면 처리: | 오일 블루밍 |
| 구조: | 롤러 체인 |
| 재료: | 탄소강 |
| 유형: | 짧은 피치 체인 |
| 샘플: |
US$ 0/개
1개(최소 주문) | |
|---|
| 사용자 정의: |
사용 가능
| 맞춤형 요청 |
|---|

How do you calculate the maximum allowable tension in a conveyor chain?
The maximum allowable tension in a conveyor chain can be calculated using the following steps:
1. Determine the Chain Pitch:
– Measure the distance between the centers of two consecutive chain pins. This measurement is known as the chain pitch and is typically expressed in inches or millimeters.
2. Determine the Chain Speed:
– Determine the speed at which the conveyor chain will be operating. The chain speed is typically expressed in feet per minute or meters per second.
3. Calculate the Chain Pull:
– Determine the total weight or force that needs to be moved by the conveyor chain. This includes the weight of the conveyed material and any additional loads or forces acting on the chain.
4. Calculate the Required Tension:
– Use the following formula to calculate the required tension:
Tension = (Chain Pull × Chain Speed) / (Chain Pitch × Efficiency)
– The efficiency factor accounts for losses due to friction and other factors and is typically expressed as a decimal between 0 and 1.
5. Determine the Maximum Allowable Tension:
– The maximum allowable tension is determined by the manufacturer’s specifications for the conveyor chain. It is important to consult the manufacturer’s documentation or contact them directly to obtain the maximum allowable tension value.
6. Compare the Required Tension and Maximum Allowable Tension:
– Compare the calculated required tension with the maximum allowable tension. The required tension should be less than or equal to the maximum allowable tension to ensure safe and reliable operation of the conveyor chain.
By following these steps and considering the manufacturer’s specifications, you can accurately calculate the maximum allowable tension in a conveyor chain and ensure that it is within the safe operating limits.

컨베이어 체인의 전력 요구 사항은 어떻게 계산합니까?
컨베이어 체인의 전력 요구량을 계산하려면 다양한 요소를 고려해야 합니다. 단계별 과정은 다음과 같습니다.
1. 운반할 총 중량 결정: 컨베이어 체인을 통해 운반될 자재 또는 제품의 총 중량을 측정하거나 추정합니다. 여기에는 제품 자체의 무게, 포장재 및 추가 적재물의 무게가 포함됩니다.
2. 컨베이어 속도 결정: 컨베이어 체인이 작동할 원하는 속도를 결정합니다. 일반적으로 분당 피트(FPM) 또는 초당 미터(m/s)로 측정합니다.
3. 필요한 용량 계산: 총 중량에 원하는 속도를 곱하여 컨베이어 시스템의 필요한 용량을 계산합니다. 이를 통해 시간 단위당 중량(예: 분당 파운드 또는 시간당 킬로그램)을 구할 수 있습니다.
4. 컨베이어 설계 요인 고려: 컨베이어 체인의 종류 및 피치, 체인과 컨베이어 구성 요소 간의 마찰 계수, 컨베이어 시스템의 경사각 등 다양한 설계 요인을 고려하십시오. 이러한 요인은 전력 요구량에 영향을 미칩니다.
5. 필요한 전력을 결정합니다. 다음 공식을 사용하여 전력 요구 사항을 계산합니다.
동력(마력) = (용량 × 마찰 계수) ÷ (33,000 × 효율)
어디:
– 용량은 시간 단위당 무게입니다(3단계에서)
– 마찰 계수는 설계 요소를 고려하여 체인 장력과 체인 무게의 비율입니다.
– 33,000은 단위를 마력으로 변환하는 변환 계수입니다.
– 효율성은 일반적으로 소수점 값으로 표현되는 컨베이어 시스템의 전체 효율성입니다(예: 95% 효율성의 경우 0.95).
6. 적합한 모터 선택: 계산된 전력 요구량을 기반으로 컨베이어 체인 구동에 필요한 전력을 공급할 수 있는 모터를 선택하십시오. 모터 유형, 모터 효율, 과부하 용량 등의 요소를 고려하십시오.
전력 요구 사항은 특정 컨베이어 시스템 설계 및 작동 조건에 따라 달라질 수 있습니다. 정확한 계산과 적절한 모터 선택을 위해 자격을 갖춘 엔지니어 또는 컨베이어 제조업체에 문의하는 것이 좋습니다.

What are the cost considerations when purchasing a conveyor chain?
When purchasing a conveyor chain, there are several cost considerations that need to be taken into account to ensure an optimal investment and operational efficiency.
1. Initial Cost: The initial cost of the conveyor chain includes the cost of the chain itself, as well as any additional components such as sprockets, attachments, and connecting links. It is important to compare prices from different suppliers and evaluate the overall value for the money.
2. Maintenance and Repair Costs: Consider the long-term maintenance and repair costs associated with the conveyor chain. Some chains may require more frequent lubrication or replacement of components, which can add to the overall operating expenses.
3. Service Life: The service life of the conveyor chain is an essential factor in determining its cost-effectiveness. Chains with longer service life may have a higher initial cost but can result in lower replacement and downtime costs in the long run.
4. Energy Efficiency: Energy consumption is an ongoing cost to consider. Conveyor chains that offer lower friction and efficient power transmission can contribute to energy savings and reduce operating expenses.
5. Maintenance Ease: Consider the ease of maintenance when selecting a conveyor chain. Chains that are easier to clean, inspect, and maintain can reduce labor costs and increase operational efficiency.
6. Compatibility and Integration: Ensure that the selected conveyor chain is compatible with the existing conveyor system or equipment. Retrofitting or modifying the system to accommodate a specific chain may incur additional costs.
7. Supplier Support and Warranty: Evaluate the level of technical support provided by the supplier and the warranty coverage offered for the conveyor chain. This can impact the overall cost of ownership and provide peace of mind in case of any unforeseen issues.
It is important to consider these factors holistically and make a cost-benefit analysis based on the specific requirements of the application. Choosing a conveyor chain that aligns with the budget, performance needs, and long-term cost considerations will help optimize the investment and ensure efficient material handling operations.


editor by CX 2023-10-16